Uploaded image for project: 'REEF (Retired)'
  1. REEF (Retired)
  2. REEF-2023 New Java Bridge with gRPC based implementation.
  3. REEF-2024

Prepare existing artifacts for new module that introduces the new bridge

    XMLWordPrintableJSON

Details

    • Sub-task
    • Status: Open
    • Major
    • Resolution: Unresolved
    • 0.17
    • 0.17
    • REEF Bridge
    • None

    Description

      This Jira represents the changes needed to the existing codebase before introducing the module containing the new bridge.

      Attachments

        Issue Links

          Activity

            People

              tcondie Tyson Condie
              tcondie Tyson Condie
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

              Dates

                Created:
                Updated:

                Time Tracking

                  Estimated:
                  Original Estimate - Not Specified
                  Not Specified
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 0.5h
                  0.5h