Details
-
Task
-
Status: Resolved
-
Major
-
Resolution: Fixed
-
None
-
None
-
Mesosphere Sprint 30
-
5
Description
We need to migrate the existing tests in src/tests/scheduler_tests.cpp to use the new callback interface introduced in MESOS-3339. The changes to src/tests/master_maintenance_tests.cpp would be done when MESOS-4831 is resolved.
For an example see SchedulerTest.SchedulerFailover which already uses this new interface.
Attachments
Issue Links
- blocks
-
MESOS-4029 ContentType/SchedulerTest is flaky.
- Resolved