Details
-
Bug
-
Status: Open
-
Major
-
Resolution: Unresolved
-
None
-
None
-
None
Description
The FairScheduler#getResourceCalculator always returns the default resource calculator. The default calculator is not resource type aware and should only be used if there are no resource types configured.
We need to make sure that in we the direct hard code reference to RESOURCE_CALCULATOR is either safe to use in all cases or is not used in the scheduler.
Attachments
Attachments
Issue Links
- blocks
-
YARN-8059 Resource type is ignored when FS decide to preempt
- Open