Details
Description
Many of the tests in TestResourceManager override the scheduler to always be CapacityScheduler. However, these tests should be made scheduler agnostic (they are testing the RM, not the scheduler).
Many of the tests in TestResourceManager override the scheduler to always be CapacityScheduler. However, these tests should be made scheduler agnostic (they are testing the RM, not the scheduler).