Details
-
Bug
-
Status: Resolved
-
Major
-
Resolution: Fixed
-
2.0
-
None
Description
The estimated time remaining displayed to the user does not include the time it takes to retrieve image files from another managment node during image load. If the scheduling system thinks the image is preloaded but is not and image retrieval is required, "Est: 1 min remaining" is displayed.