Uploaded image for project: 'Stratos'
  1. Stratos
  2. STRATOS-545

Topology synchronization period needs to be configurable

    Details

    • Type: Bug
    • Status: Resolved
    • Priority: Major
    • Resolution: Fixed
    • Affects Version/s: 4.0.0 Alpha
    • Fix Version/s: 4.0.0
    • Component/s: Cloud Controller
    • Labels:
      None

      Description

      Topology synchronization period in CC needs to be configurable rather than a hard coded value for 60s.

        Attachments

        1. topology.patch
          7 kB
          Reka Thirunavukkarasu

          Activity

            People

            • Assignee:
              nirmal Nirmal Fernando
              Reporter:
              reka Reka Thirunavukkarasu
            • Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

              Dates

              • Created:
                Updated:
                Resolved: