Description
There are three issues when tasks get remote results:
(1) The status never changes from GET_RESULT to SUCCEEDED
(2) The time to get the result is shown as the absolute time (resulting in a non-sensical output that says getting the result took >1 million hours) rather than the elapsed time
(3) The getting result time is included as part of the scheduler delay
cc shivaram