Details
-
Improvement
-
Status: Resolved
-
Major
-
Resolution: Won't Fix
-
None
-
None
-
None
Description
Running all the tests in dev/run-tests takes up to 2 hours. A common strategy to cut test time down is to parallelize the execution of the tests. Doing that may in turn require some prerequisite changes to be made to how certain tests run.
Attachments
Attachments
Issue Links
- is duplicated by
-
SPARK-2223 Building and running tests with maven is extremely slow
- Resolved
- is related to
-
SPARK-3490 Alleviate port collisions during tests
- Resolved
-
SPARK-5161 Parallelize Python test execution
- Resolved
- links to
(1 links to)
1.
|
Fix logging of unit test execution time | Resolved | Reynold Xin |