Uploaded image for project: 'Apache PLC4X'
  1. Apache PLC4X
  2. PLC4X-13

Replace the camel parent pom in the distribution management

    XMLWordPrintableJSON

Details

    • Improvement
    • Status: Resolved
    • Minor
    • Resolution: Fixed
    • None
    • 0.1.0
    • None
    • None

    Description

      Currently when generating the site, the build of the camel integration project takes up 90% of the build time as maven has to resolve the poms for (it feels like) all Maven artifacts there are. This blows up the dependency management report and should be optimized to only define the required versions as the user using Camel will probably have configured the camel system in his application and not rely on PLC4X pulling it in for him.

      Attachments

        Activity

          People

            sruehl Sebastian Rühl
            cdutz Christofer Dutz
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

            Dates

              Created:
              Updated:
              Resolved: