Description
The Job takes ~3 hours with 2.4 , ~3.5 hours with 2.5 and is interrupted after 5 hours with 2.6.
While I did not see OOM errors, this could still be GC thrashing, as newer HBase / Hadoop version use more heap.
Attachments
Issue Links
- is related to
-
PHOENIX-7264 Admin.flush() hangs in HBase 3 while the clock is stopped
- Open
- relates to
-
PHOENIX-7373 Fix test hangs with HBase 2.6 caused by PHOENIX-6978
- Resolved
-
PHOENIX-7353 Disable remote procedure delay in TransformToolIT
- Closed
- links to