Details
-
Sub-task
-
Status: Closed
-
Major
-
Resolution: Abandoned
-
None
-
None
-
None
Description
The structure in [1] should follow directory structure of the code base (in the repo) as much as possible.
The structure in [1] should follow directory structure of the code base (in the repo) as much as possible.