Details
-
Sub-task
-
Status: Resolved
-
Blocker
-
Resolution: Fixed
-
1.0.0
-
None
Description
Currently, Controller Services can be scoped to any Process Group. However, Reporting Tasks should not be able to reference the services that are assigned to a process group. We need to allow Controller Services to be scoped at the Controller Level and allow them to be referenced only by Reporting Tasks and other Controller Services that are scoped at the Controller level.
Attachments
Issue Links
- links to