Details
-
Task
-
Status: Closed
-
Major
-
Resolution: Fixed
-
3.1.0, 4.0.0
Description
Split the incremental load into multiple iterations. In each iteration create number of tasks equal to the configured value.
Attachments
Attachments
Issue Links
- duplicates
-
HIVE-17227 Incremental replication load should create tasks in execution phase rather than semantic phase
- Closed
- is cloned by
-
HIVE-20120 Incremental repl load DAG generation is causing OOM error.
- Closed
- links to