Uploaded image for project: 'Apache Ozone'
  1. Apache Ozone
  2. HDDS-3698 Ozone Non-Rolling upgrades
  3. HDDS-4828

SCM should go into "safe mode" until there is at least 1 pipeline to work with after finalization.

    XMLWordPrintableJSON

Details

    • Sub-task
    • Status: Resolved
    • Major
    • Resolution: Fixed
    • 1.2.0
    • None
    • SCM

    Description

      On the docker cluster it was noticed that although SCM can finalize very quickly, it takes at least a heartbeat amount of time for DNs to finalize and only after that can an open pipeline be ready on the SCM. It would be a good experience for the SCM finalization to wait for at least 1 pipeline to be ready for use after finalization after declaring success.

      Attachments

        Issue Links

          Activity

            People

              erose Ethan Rose
              avijayan Aravindan Vijayan
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved: