Details
-
New Feature
-
Status: Resolved
-
Major
-
Resolution: Invalid
-
None
-
None
-
None
-
None
Description
The current Hadoop MRV1/YARN resource management logic assumes per node (TT/NM) resource is static during the lifetime of the TT/NM process. Allowing run-time configuration on per node resource will give us finer granularity of resource elasticity. This allows Hadoop workloads to coexist with other workloads on the same hardware efficiently, whether or not the environment is virtualized.
Attachments
Attachments
Issue Links
- is superceded by
-
MAPREDUCE-4900 Dynamic configuration for task slots on TT
- Open
-
YARN-291 [Umbrella] Dynamic resource configuration
- Open