Details
-
Improvement
-
Status: Closed
-
Major
-
Resolution: Duplicate
-
None
-
None
-
None
Description
Right now, if a savepoint is triggered the job keeps running. At the same time, on STOP a last checkpoint should be collected for a clean shutdown (WIP: https://issues.apache.org/jira/browse/FLINK-3408).
This work should enable stopping a job and getting a final savepoint at the same time. Thus, a job can get stopped gracefully and resumed later on using the gathered checkpoint.
Attachments
Issue Links
- is superceded by
-
FLINK-11458 Add TERMINATE/SUSPEND Job with Savepoint (FLIP-34)
- Closed