Uploaded image for project: 'Flink'
  1. Flink
  2. FLINK-30463

Stabilization period starts before job goes into RUNNING

    XMLWordPrintableJSON

Details

    Description

      We are tracking the stabilization period from the job start time which can greatly vary from the time the job goes into RUNNING state. This can result in no stabilization period at all leading to poor scaling decisions.

      Thus, we should change the logic to use the update time in combination with a RUNNING job status.

      Attachments

        Issue Links

          Activity

            People

              mxm Maximilian Michels
              mxm Maximilian Michels
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved: