Details
-
Test
-
Status: Closed
-
Major
-
Resolution: Fixed
-
1.12.0
-
None
Description
system_tests_fallback_dest test class SwitchoverTest has an error where it opens the fallback receiver on the primary receiver connection and not on the fallback receiver connection.
Fixing that test code mistake reveals a hard failure on test_29 and test_30 with a time out. All phase 1 messages released since the sender on the edge has no path to the fallback receiver.