Uploaded image for project: 'Continuum'
  1. Continuum
  2. CONTINUUM-1421

Add an admin task to stop properly Continuum

    XMLWordPrintableJSON

Details

    • Improvement
    • Status: Open
    • Major
    • Resolution: Unresolved
    • None
    • None
    • Core system

    Description

      When a project is building and an admin stop continuum, the actual build result is never marked as stopped.

      A possible solution would be to planned a shutdown in the web interface via a form. With this action, all sheduler will be stopped and a message will be sent to the admin (page after the submit in the shutdown form). With this message, the admin will know that he can shutdown Continuum properly without non ended build process.

      Attachments

        Issue Links

          Activity

            People

              Unassigned Unassigned
              evenisse Emmanuel Venisse
              Votes:
              3 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

                Created:
                Updated: