Uploaded image for project: 'Buildr (Retired)'
  1. Buildr (Retired)
  2. BUILDR-413

Not All Tests are run if starting at top project level

    XMLWordPrintableJSON

Details

    • Bug
    • Status: Closed
    • Major
    • Resolution: Auto Closed
    • 1.3.5
    • Wish List
    • Test frameworks
    • None

    Description

      When running unit tests, and running from the top level project using test=all does not continue running all the tests. It runs all the tests until there is a failure in a project, and then runs the all the tests in that project, but then stops running tests. Ideally, it should continue running tests in all the other projects as well as there may be additional tests that need to be reported as failures. This is critical when doing a continuous integration build so that the developers get proper feedback on the state of the build.

      I'll attach a screen shot from a Hudson build that shows the pattern I'm talking about.

      Attachments

        1. IrraticTestPattern.png
          84 kB
          David Carver
        2. buildr-testall.zip
          19 kB
          Alex Boisvert

        Activity

          People

            toulmean Antoine Toulme
            kingargyle David Carver
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

            Dates

              Created:
              Updated:
              Resolved: