Uploaded image for project: 'Beam'
  1. Beam
  2. BEAM-13096

beam_PostCommit_Go fails due to Dataflow ValidatesRunner tests now timing out due to addition of new test

Details

    • Bug
    • Status: Resolved
    • P2
    • Resolution: Fixed
    • None
    • Missing
    • sdk-go, test-failures
    • None

    Description

      Cause: https://github.com/apache/beam/pull/15743

      It looks like the addition of TestValidateWindowedSideInputs bumped us above the 1h timeout such that the Go PostCommit will timeout more often (for example https://ci-beam.apache.org/job/beam_PostCommit_Go/9019/)

      It used to be that the run would take ~55mins.

      Checking the associated job (https://console.cloud.google.com/dataflow/jobs/us-central1/2021-10-21_06_01_28-15917691559290441824?project=apache-beam-testing) and it passed after about 8 mins so `~55 + ~8 > 1h`.

      Attachments

        Issue Links

          Activity

            People

              lostluck Robert Burke
              lcwik Luke Cwik
              Votes:
              0 Vote for this issue
              Watchers:
              2 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved:

                Time Tracking

                  Estimated:
                  Original Estimate - Not Specified
                  Not Specified
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 50m
                  50m