Details
-
Story
-
Status: Resolved
-
Minor
-
Resolution: Won't Fix
-
None
-
None
-
None
Description
something that would fulfill my need would be in the next d:h:m:s(days:hours:minutes:seconds) from NOW,
do not run(or skip running) the job even though it may be scheduled to run for x times within that time range.
if a job is scheduled to run at T0, T6, T12, T18 UTC everyday, and I did a snooze 0:8:0:0 for this job at UTC T16, then the next 2 runs(T18 today and T0 tomorrow) of the job should be skipped.
another useful interface for me would be snooze x -> x is the number of runs from NOW to skip.
Design: https://docs.google.com/document/d/1NEMb9Qbc9T9ZBlOifkRjB2OYGnO_pNURNQcsSLXArSk/edit