Uploaded image for project: 'Apache Apex Core'
  1. Apache Apex Core
  2. APEXCORE-56

Controlled plan modification on operator shutdown

    XMLWordPrintableJSON

Details

    • Bug
    • Status: Closed
    • Major
    • Resolution: Fixed
    • None
    • 3.2.0
    • None
    • None

    Description

      When the operator signals shutdown, StrAM needs to remove it from execution layer and plan. The plan modification needs to occur when the window was fully processed downstream. This is required to support deterministic termination of apps driven by the input operator(s).

      Attachments

        Activity

          People

            ishark Isha Arkatkar
            thw Thomas Weise
            Votes:
            0 Vote for this issue
            Watchers:
            4 Start watching this issue

            Dates

              Created:
              Updated:
              Resolved: