@@ -697,11 +697,11 @@
- - Move svn repository from incubator to new location
+
- Migrate svn repository from incubator to its new location
- PMC sends email to infrastructure@ and opens a JIRA issue requesting
-that infrastructure move the svn repository.
+that infrastructure migrate the svn repository.
- PMC updates the svn-authorization files to provide committers access
to the newly-named repositories.
@@ -712,7 +712,7 @@
- - Move web site
+
- Migrate web site
- PMC emails root@ and opens a JIRA issue requesting UNIX karma for
@@ -750,11 +750,11 @@
- - Move mail lists:
+
- Migrate mail lists:
- PMC sends email to infrastructure@ and opens a JIRA issue requesting
-that the mailing lists and archives be moved.
+that the mailing lists and archives be migrated
Index: site-author/incubation/Roles_and_Responsibilities.xml
===================================================================
--- site-author/incubation/Roles_and_Responsibilities.xml (revision 505776)
+++ site-author/incubation/Roles_and_Responsibilities.xml (working copy)
@@ -58,7 +58,7 @@
-
- - successfully exit incubation;
+
- graduate from incubation;
- continue to receive guidance and support within the Incubator; or
@@ -120,7 +120,7 @@
or planned with existing Apache Projects/Products).
- Naturally, projects will need more than this in order to exit
+
Naturally, projects will need more than this in order to graduate from
incubation status.
A candidate project compliant with the above criteria may be proposed
Index: site-publish/incubation/Roles_and_Responsibilities.html
===================================================================
--- site-publish/incubation/Roles_and_Responsibilities.html (revision 505776)
+++ site-publish/incubation/Roles_and_Responsibilities.html (working copy)
@@ -120,7 +120,7 @@
- - successfully exit incubation;
+
- graduate from incubation;
- continue to receive guidance and support within the Incubator; or
@@ -186,7 +186,7 @@
or planned with existing Apache Projects/Products).
-Naturally, projects will need more than this in order to exit
+
Naturally, projects will need more than this in order to graduate from
incubation status.
A candidate project compliant with the above criteria may be proposed
Index: site-publish/incubation/Process_Description.html
===================================================================
--- site-publish/incubation/Process_Description.html (revision 505776)
+++ site-publish/incubation/Process_Description.html (working copy)
@@ -208,10 +208,10 @@
Incubator PMC
(referencing the voting result e-mail) that your candidate project be
-escalated to
+accepted by the Incubator as a
Podling
-status. The Sponsor will assign a
+. The Sponsor will assign a
Mentor
. The Mentor may, or may not, be your original Champion. If not, it
@@ -256,7 +256,7 @@
(infrastructure, communications, decision making) you will inevitably
come under an assessment by the Incubator PMC concerning the exit of
your project from the incubator. Keep in mind that exit can be a good
-things and bad thing. Exit via escalation to a top-level project or
+things and bad thing. Exit via graduation to a top-level project or
perhaps a subproject of an existing PMC would typically be viewed as
a positive exit. On the other-hand, termination is also an exit
condition that may be considered. With an upcoming assessment it is
@@ -274,7 +274,7 @@
continuation under incubation with recommendations; or
- exit via escalation into Apache.
+ graduation into Apache.
Note that whilst this is a recommendation, it carries a lot of
@@ -323,7 +323,7 @@
Index: site-publish/incubation/Incubation_Policy.html
===================================================================
--- site-publish/incubation/Incubation_Policy.html (revision 505783)
+++ site-publish/incubation/Incubation_Policy.html (working copy)
@@ -450,18 +450,18 @@
After each review, the Incubator PMC SHALL produce an Assessment of
the project. The Assessment SHALL contain one of three
-recommendations :
+recommendations:
- that the Podling be Terminated;
- that the Podling continue in Incubation; or
- - that the Podling be escalated out of the Incubator.
+
- that the Podling be Graduated from Incubation.
-
Termination and Escalation are discussed in more detail in section
-"Exiting the Incubator".
+
Termination and Graduation are discussed in more detail in section
+"Graduating from the Incubator".
@@ -479,7 +479,7 @@
feedback MAY include a change to the original Assessment.
Should the Podling and/or Mentor still disagree with the contents of
-the report, they may appeal to the Board of the Apache Software
+the report, they MAY appeal to the Board of the Apache Software
Foundation. Such an appeal MUST include