Step 1 of 4: Choose Issues

Cancel

T Patch Info Key Summary Assignee Reporter P Status Resolution Created Updated Due Development
Sub-task FLINK-13223

FLINK-4256 Set jobmanager.execution.failover-strategy to region in default flink-conf.yaml

Chesnay Schepler Gary Yao Blocker Closed Fixed  
Sub-task FLINK-13222

FLINK-4256 Add documentation for AdaptedRestartPipelinedRegionStrategyNG

Zhu Zhu Gary Yao Blocker Resolved Fixed  
Sub-task FLINK-13169

FLINK-4256 IT test for fine-grained recovery (task executor failures)

Andrey Zagrebin Andrey Zagrebin Critical Closed Fixed  
Sub-task FLINK-13145

FLINK-4256 Run HA dataset E2E test with new RestartPipelinedRegionStrategy

Gary Yao Gary Yao Blocker Resolved Fixed  
Sub-task FLINK-13055

FLINK-4256 Leverage JM side partition state to improve region failover experience

Zhu Zhu Zhu Zhu Major Closed Fixed  
Sub-task FLINK-13019

FLINK-4256 IT test for fine-grained recovery (user code failures)

Andrey Zagrebin Andrey Zagrebin Major Closed Done  
Sub-task FLINK-12876

FLINK-4256 Add an adapter of region failover NG for legacy scheduler

Zhu Zhu Zhu Zhu Major Closed Fixed  
Sub-task FLINK-12643

FLINK-4256 Implement ExecutionGraph to FailoverTopology Adapter

Zhu Zhu Zhu Zhu Major Closed Fixed  
Sub-task FLINK-12458

FLINK-4256 Introduce PartitionConnectionException for unreachable producer

Zhijiang Zhijiang Minor Resolved Fixed  
Sub-task FLINK-12369

FLINK-4256 Implement a region failover strategy based on new FailoverStrategy interfaces

Zhu Zhu Zhu Zhu Major Closed Fixed  
Sub-task FLINK-12131

FLINK-4256 Resetting ExecutionVertex in region failover may cause inconsistency of IntermediateResult status

Zhu Zhu Zhu Zhu Major Resolved Fixed  
Sub-task FLINK-12068

FLINK-4256 Backtrack failover regions if intermediate results are unavailable

Zhu Zhu Till Rohrmann Major Resolved Implemented  
Sub-task FLINK-10205

FLINK-4256 Batch Job: InputSplit Fault tolerant for DataSourceTask

ryantaocer JIN SUN Major Closed Implemented  
Sub-task FLINK-6340

FLINK-4256 Introduce a TerminationFuture for Execution

Stephan Ewen Stephan Ewen Major Closed Fixed  
Sub-task FLINK-6227

FLINK-4256 Introduce the abstract PartitionException for downstream task failure

Zhijiang Zhijiang Minor Closed Fixed  
Sub-task FLINK-5869

FLINK-4256 ExecutionGraph use FailoverCoordinator to manage the failover of execution vertexes

shuai.xu shuai.xu Major Closed Fixed  
Sub-task FLINK-5868

FLINK-4256 Implement a new RestartStrategy that works for the FailoverRegion.

shuai.xu shuai.xu Major Closed Fixed  
Sub-task FLINK-5867

FLINK-4256 The implementation of RestartPipelinedRegionStrategy

shuai.xu shuai.xu Major Closed Fixed  
Sub-task FLINK-5866

FLINK-4256 The implementation of FailoverRegion.

shuai.xu shuai.xu Major Closed Fixed  
Sub-task FLINK-4321

FLINK-4256 Initialize TaskExecutions directly with their starting state

Stephan Ewen Stephan Ewen Major Closed Won't Fix  
Sub-task FLINK-4320

FLINK-4256 Fix misleading ScheduleMode names

Stephan Ewen Stephan Ewen Minor Closed Fixed  
Sub-task FLINK-4312

FLINK-4256 Remove Serializabiliy of ExecutionGraph

Stephan Ewen Stephan Ewen Minor Closed Fixed  

Cancel