I realized that this was never going to happen unless I scheduled it
as a task in the issue tracker :-) :
Consider all issues 0.18 and beyond, figure out what really needs to
be in Beta, what can go into 1.0, and what can move to Post-1.0. Of
the Beta bugs, assign to milestones, but leaving enough room in each
milestone for the usual small bugs that are discovered during a
milestone (so probably each milestone should start out with one big
item and 2 to 4 smaller items).
Do this with Mike, Ben, and Greg Stein, while Greg is in Chicago, Dec.
2-6.