Uploaded image for project: 'Apache Storm'
  1. Apache Storm
  2. STORM-3755

While scheduling multiple ackers with executor use best effort basis

    XMLWordPrintableJSON

    Details

    • Type: Improvement
    • Status: Resolved
    • Priority: Minor
    • Resolution: Fixed
    • Affects Version/s: None
    • Fix Version/s: 2.3.0
    • Component/s: storm-server
    • Labels:
      None

      Description

      In the scheduling loop, if the number of ackers to be scheduled along with the executor is greater than zero, and they cannot all fit, then try to fit as many ackers as possible.

      To do this, fit the executor first. If this succeeds, then attempt to fit as many ackers are possible upto and including the max required as per calculation (and as low as zero). This second step should not fail.

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                bipinprasad Bipin Prasad
                Reporter:
                bipinprasad Bipin Prasad
              • Votes:
                0 Vote for this issue
                Watchers:
                2 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved:

                  Time Tracking

                  Estimated:
                  Original Estimate - Not Specified
                  Not Specified
                  Remaining:
                  Remaining Estimate - 0h
                  0h
                  Logged:
                  Time Spent - 20m
                  20m