Uploaded image for project: 'Phoenix'
  1. Phoenix
  2. PHOENIX-3181 Run test methods in parallel to reduce test suite run time
  3. PHOENIX-3282

Convert BaseClientManagedTimeIT to be derived from BaseHBaseManagedTimeTableReuseIT

    XMLWordPrintableJSON

Details

    • Sub-task
    • Status: Open
    • Major
    • Resolution: Unresolved
    • None
    • None
    • None
    • None

    Description

      Convert BaseClientManagedTimeIT to be derived from BaseHBaseManagedTimeTableReuseIT by:

      • Using unique table names in all tests
      • Removing any usage of BaseTest.ensureTableCreated()
      • Change static methods and member variables to be instance level

      Also, we should convert these tests to not manage there own timestamps (i.e. do not set the CURRENT_SCN property and do not open new connections) unless the test depends on this functionality (which I believe is only the case for PointInTimeQueryIT).

      Attachments

        Activity

          People

            Unassigned Unassigned
            jamestaylor James R. Taylor
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

            Dates

              Created:
              Updated: