Uploaded image for project: 'OpenJPA'
  1. OpenJPA
  2. OPENJPA-1143

Synch JPA 2.0 development with evolving JPA 2.0 Spec

VotersWatch issueWatchersLinkCloneUpdate Comment AuthorReplace String in CommentUpdate Comment VisibilityDelete Comments
    XMLWordPrintableJSON

Details

    • Task
    • Status: Closed
    • Major
    • Resolution: Fixed
    • None
    • 2.0.0-M3
    • jpa
    • None

    Description

      The current development of JPA 2.0 features is based on JPA 2.0 Specification published mid-March 2009. Since then, the specification has evolved in major way. However, no public draft version of the specification is available or planned in near future. Several strategic and logistical steps will be taken to narrow the gap between ongoing implementation and the current version of the unpublished spec.

      1. The latest spec API to repository will be checked-in as 1.0-EA3-SNAPSHOT
      2. Build dependency will be updated to this latest version.
      3 The implementation will be refactored to the latest spec version. This refactored implementation merely compiles and is not validated by tests.
      4. CriteriaQuery and MetaModel tests are deactivated till the spec API stabilizes. Because the query result processing is going through serious churn. Hence, any effort to reorient and validate 200+ tests against a meta-stable API has little value at this point.
      5. Given the rather long names of some of the new API and their generic type argument list, the existing line length limit of 80 will be relaxed to 120 for better readability.

      Attachments

        Issue Links

        There are no Sub-Tasks for this issue.

        Activity

          This comment will be Viewable by All Users Viewable by All Users
          Cancel

          People

            ppoddar@apache.org Pinaki Poddar
            ppoddar@apache.org Pinaki Poddar
            Votes:
            0 Vote for this issue
            Watchers:
            0 Start watching this issue

            Dates

              Created:
              Updated:
              Resolved:

              Time Tracking

                Estimated:
                Original Estimate - 168h
                168h
                Remaining:
                Remaining Estimate - 168h
                168h
                Logged: