    • This happens in following setups:
      R15.12 against MySQL
      R15.12 against PostgreSQL

      It does not happen in setup:
      R15.12 against Derby.

    Description

      When a new production run is generated based on a production schema with tasks, the process takes the tasks of the schema (in the designated order) and calculate the start and end date for each task (based on the provided start date of the production run.

      This process doesn't work properly as tasks with a total throughput time (setup + run time) more than 1 day leads to wrong results.

      Attachments

        Activity

          People

            pierresmits Pierre Smits
            pierresmits Pierre Smits
            Votes:
            0 Vote for this issue
            Watchers:
            0 Start watching this issue

            Dates

              Created:
              Updated:
              Resolved: