Details

    • Type: Task
    • Status: Open
    • Priority: Major
    • Resolution: Unresolved
    • Affects Version/s: 1.0.1
    • Fix Version/s: None
    • Component/s: documentation
    • Labels:
      None

      Description

      cc Neil Conway

      AFAICT, the "offer cycle" in Mesos is undocumented. As it has been explained to me, the master will send on offer to a successive list of frameworks ordered by DRF, with a 1s gap in between each offer. And when the decline timeout (default 5s) is reached, it will start over at the beginning of the list. This means that, by default, all other frameworks other than the first 5 in DRF ordering will be starved.

      I'm going to submit a separate JIRA with a proposal to fix this, but at the very least, we should document the above behavior.

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                Unassigned
                Reporter:
                mgummelt Michael Gummelt
              • Votes:
                0 Vote for this issue
                Watchers:
                3 Start watching this issue

                Dates

                • Created:
                  Updated: