Uploaded image for project: 'Apache Ozone'
  1. Apache Ozone
  2. HDDS-3698 Ozone Non-Rolling upgrades
  3. HDDS-4610

Fix issues in 'prepare' operation with one OM down.

    XMLWordPrintableJSON

Details

    Description

      On a 3 node OM HA setup, when a prepare is done with 1 OM down, it leads to a state where the leader and follower are fully prepared (Snapshot at last index and logs purged). When the 3rd node rejoins the quorum, it leads to an infinite installSnapshot loop between the leader and the 3rd node, and the system goes into a bad state until a restart is done.

      Attachments

        Issue Links

          Activity

            People

              avijayan Aravindan Vijayan
              avijayan Aravindan Vijayan
              Votes:
              0 Vote for this issue
              Watchers:
              3 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved: