Uploaded image for project: 'Geode'
  1. Geode
  2. GEODE-8740

increase test job timeouts

    XMLWordPrintableJSON

    Details

      Description

      Recently UpgradeTestOpenJDK8 has been taking ~59 minutes and its job timeout is 1h.  After adding 1.13.1 as old version, it tipped to taking slightly over an hour on JDK8 (which is why it wasn't caught in PR, which only checks JDK11).  Timeout for this job should be increased to 1h30m as there's no need to cut it so close.

      Recent changes to Benchmarks have also caused longer runs (from 4h -> 7h in the best case, and much much longer in the worst case).  The current job timeout of 8h is being hit frequently, and after trying a temporary increase to 16h, we still saw successful runs taking 15h, and still some timing out...  

        Attachments

          Issue Links

            Activity

              People

              • Assignee:
                Unassigned
                Reporter:
                onichols Owen Nichols
              • Votes:
                0 Vote for this issue
                Watchers:
                3 Start watching this issue

                Dates

                • Created:
                  Updated:
                  Resolved: