Uploaded image for project: 'Flink'
  1. Flink
  2. FLINK-30528

Job may be stuck in upgrade loop when last-state fallback is disabled and deployment is missing

    XMLWordPrintableJSON

Details

    Description

      When last-state upgrade fallback is disabled (or we are switching flink versions) and the JM deployment is missing for some reason, we get stuck in the upgrade loop as the spec change /upgrade logic always takes precedence over the JM deployment recovery logic.

      In this cases the JM deployment need to be recovered first so savepoint upgrade can be executed.

      Attachments

        Issue Links

          Activity

            People

              gyfora Gyula Fora
              gyfora Gyula Fora
              Votes:
              0 Vote for this issue
              Watchers:
              1 Start watching this issue

              Dates

                Created:
                Updated:
                Resolved: