Uploaded image for project: 'Flink'
  1. Flink
  2. FLINK-29748

Expose the optimize phase in the connector context

    XMLWordPrintableJSON

Details

    Description

      Currently, in the connector it can not know whether the whole optimize is finished.
      When the optimize finished, the all information is static, eg: the reading partitions. If I want to validate the final optimized result (like whether the reading partition is too much or empty), it needs the context of what is the current phase. I think the ScanContext is ok to expose this information.

      Attachments

        Activity

          People

            Unassigned Unassigned
            aitozi WenJun Min
            Votes:
            0 Vote for this issue
            Watchers:
            3 Start watching this issue

            Dates

              Created:
              Updated:
              Resolved: