Uploaded image for project: 'ActiveMQ'
  1. ActiveMQ
  2. AMQ-3773

org.apache.activemq.ra.ActiveMQEndpointWorker run should not be synchronized

    XMLWordPrintableJSON

Details

    • Bug
    • Status: Closed
    • Major
    • Resolution: Duplicate
    • None
    • None
    • JCA Container
    • JBoss AS 7.1

    Description

      from http://activemq.2283324.n4.nabble.com/ActiveMQEndpointWorker-run-method-cannot-be-synchronized-td4330542.html
      There has been a discussion on the JBoss 7 forums about errors getting the ActiveMQ resource adapter working correctly in JBoss (see https://community.jboss.org/message/648857)

      When JBoss attempts to deploy the rar file, it was throwing this error:

      ERROR [org.apache.activemq.ra.ActiveMQEndpointWorker] (MSC service thread 1-4) Work Manager did not
      accept work: : javax.resource.spi.work.WorkException: IJ000257:
      org.apache.activemq.ra.ActiveMQEndpointWorker$1: Run method is synchronized

      One member on the forum modified the source code for org.apache.activemq.ra.ActiveMQEndpointWorker and took out the "synchronized" keyword from the "run" method (line 97), and this fixed the problem. I modified the code as well and it fixed my problem too. According to a JBoss representative, ActiveMQ is out of spec on this, and claims that this should be fixed on the ActiveMQ side.

      Please consider modifying this class. Otherwise, nobody will be able to use the resource adapter with JBoss.

      Attachments

        Activity

          People

            Unassigned Unassigned
            jhliptak John Liptak
            Votes:
            0 Vote for this issue
            Watchers:
            0 Start watching this issue

            Dates

              Created:
              Updated:
              Resolved: