Uploaded image for project: 'Apache Drill'
  1. Apache Drill
  2. DRILL-4891

Use field width when available for computing estimated memory costing

    XMLWordPrintableJSON

Details

    • Improvement
    • Status: Open
    • Major
    • Resolution: Unresolved
    • 1.8.0
    • None
    • None

    Description

      Drill currently uses an average field width (in addition to other parameters) for computing estimated memory cost for hash and sort based operations. The assumption is that the field is of ANY type. However, when a view with appropriate CAST is used, the relevant data type is available and we should leverage the correct field width for the costing calculations.

      Attachments

        Activity

          People

            Unassigned Unassigned
            amansinha100 Aman Sinha
            Votes:
            0 Vote for this issue
            Watchers:
            1 Start watching this issue

            Dates

              Created:
              Updated: